Sunday, August 1, 2010

EPA Rule Increases Protection from Lead-Paint Poisoning Agency also extends deadline for required training
" Beginning today, all contractors performing renovation, repair or painting work in homes built before 1978 must follow lead-safe work practice requirements. A new EPA rule removes a provision from existing regulations that allowed owner-occupants of pre-1978 homes to “opt-out” of having their contractors follow lead-safe work practices if there were no children under six years of age in the home.

At present, almost a million children have elevated blood lead levels as a result of exposure to lead hazards, which can lead to lower intelligence, learning disabilities, and behavior issues. Adults exposed to lead hazards can suffer from high blood pressure and headaches. EPA has eliminated the so-called opt-out provision because improper renovations in older homes can create lead hazards resulting in harmful health effects for residents and visitors in these homes, regardless of age. The result will better protect children and adult occupants during and after renovation, repair and painting projects.

In April 2008, EPA issued the Lead Renovation, Repair and Painting (RRP), which required the use of lead-safe work practices in pre-1978 homes but included the opt-out provision. EPA’s new rule, effective today, removes the opt-out provision and makes the RRP consistent with statutory requirements..."

No comments: